AMARUBE iron bridge

this iron bridge --1912-- time for 2 years, about 330,000 the great cost of yen, it was completed by investing total 250,000 laborers A construction style harvests an opinion of an American man engineer by railroad engineer Mr.Furukawa etc. by the Toresle type , and materials of pier are sent from the U.S.A. Height of 41 m Although the scale with a length of 309 m came out as East 1 those days, it is proud of the scale of the top of Japan on the Toresle type iron bridge even now.